Thursday, 31 March 2016 09:16

BTS-9000

Written by
Rate this item
(0 votes)

BTS9000 is based on Neware 6th-generation testing system. It's designed for battery material research, high-precision tests, pulse charge/discharge tests, DCIR test, and cycle life test. 

As the most cutting-edge equipment for battery material research, BTS9000 comes with extremely high accuracy(±0.02% of FS), amazing hardware response speed(≤100μs), wide range of applications, high-speed testing data acquisition and many other industry-proven characteristics, it's your ultimate choice for battery material research!

It characterized with a data acquisition frequency up to 1000Hz, an accuracy of 0.02% FS and a minimum pulse width of 400us (microsecond) which can be utilized for GSM or some other rapid pulse tests. Comes to the pulse tests, BTS9000 supports GSM(Global System for Mobile Communications), GPRS(General Packet Radio Service), CDMA-standby, CDMA-talk(Code Division Multiple Access), IDEN(Integrated Digital Enhanced Networks), etc.

 

1.Resolution: AD: 16bit; DA: 16bit;

2.Accuracy : 0.02% FS;

3.Response Time: ≤100us (Current in the range 10%~90% FS);

4.Data Acquisition Frequency: 1000Hz;

5.Minimum Pulse Width: 400us;

6.Voltage Range: 5V;

7.Current Ranges: Range 1: 160uA ± 32nA

                                  Range 2: 5mA ± 1uA

                                  Range 3: 160mA ± 32uA

                                  Range 4: 5000mA ± 1mA

Read 250775 times Last modified on Friday, 18 November 2016 09:36

8427 comments

  • Comment Link RandomNameFrago Wednesday, 24 December 2025 21:45 posted by RandomNameFrago

    planned action – Encourages careful structuring to maximize impact.

  • Comment Link JamesFrago Wednesday, 24 December 2025 21:37 posted by JamesFrago

    pathways navigator – Helps identify clear routes for executing actions with confidence.

  • Comment Link RandomNameFrago Wednesday, 24 December 2025 21:11 posted by RandomNameFrago

    alignment mechanism – Shows how clarity aligns actions with objectives for better results.

  • Comment Link RandomNameFrago Wednesday, 24 December 2025 21:03 posted by RandomNameFrago

    organized progress – Planning and aligned execution create consistent results.

  • Comment Link JamesFrago Wednesday, 24 December 2025 21:02 posted by JamesFrago

    goalnavigator – Demonstrates using directional tools to align actions with objectives.

  • Comment Link RandomNameFrago Wednesday, 24 December 2025 20:56 posted by RandomNameFrago

    goal execution – Keeps efforts aligned with desired objectives consistently.

  • Comment Link RandomNameFrago Wednesday, 24 December 2025 20:46 posted by RandomNameFrago

    task architect – Helps plan and execute steps in a clear and organized manner.

  • Comment Link JamesFrago Wednesday, 24 December 2025 20:42 posted by JamesFrago

    executionhub – Very useful, highlights how a systems approach streamlines execution and ensures measurable results.

  • Comment Link RandomNameFrago Wednesday, 24 December 2025 20:29 posted by RandomNameFrago

    Forward Drive Hub – Guides actions efficiently to keep projects advancing

  • Comment Link RandomNameFrago Wednesday, 24 December 2025 20:15 posted by RandomNameFrago

    initiatorclarity – Shows how clear steps at the start accelerate project progress.

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.